Provide customers with solutions in terms of improving power quality, optimizing control, and energy saving and consumption reduction.
Improving power quality and optimizing control
Liaoning Rongxin Xingye Power Technology Co., Ltd. is committed to becoming a reliable partner of customers through honest management. In order to continuously improve the service quality.
Rongxin Xingye is taking "Rongxin" as the foundation and "Xingye" as its mission, using the wisdom and diligence from China to provide global customers with high-quality products and services to achieve green life and sustainable development.
Read more >"Rongrong grass and trees, longevity of faith", Rongxin Xingye advocates a green lifestyle
Focus on energy efficiency and achieve sustainable social development with high-quality products, services and solutions.
Focusing on the development goals of the company's strategic planning, absorbing the essence of corporate culture, and creating a sound, efficient and innovative human resource system.
Liaoning Rongxin Xingye Power Technology Co., Ltd. was established in March 2017. It is a high-tech enterprise focusing on the manufacture of energy-saving and high-power power electronic equipment.
RSVG for load compensation of electric arc furnace--Substation of Fujian Hua'an hydropower plant. The 10kV busbar of Fujian Hua'an hydropower plant power development company 35kV Jinshan No.2 substation is connected with four feeders of Yuxing I, II, III and IV for the load of HUAYIXIN iron plant. Yuxing I and II feed two 8000kVA electric arc furnaces respectively, YuxingIII supply one 4000kVA refining furnace, Yuxing IV supply one 630kVA power transformer and 5000kVA reactive power compensation device. In normal production, two EAF and refining furnace will be produced at the same time.
With the rapid development of electrified railway, its influence on power supply and consumption system side is increasingly prominent. Because the railway is a 27.5kV single-phase load, if the balance compensation is not carried out, the voltage of the public access point will be seriously unbalanced, which will have a serious impact on other loads of the network point.
No. 108, Keji Road, Lishan District, Anshan City, Liaoning Province
+86 4127260721 overseas@rxpe.com Business license
Copyright 2024 rxpe.com | All rights Reseved